Mar 9, 2016 10:04
8 yrs ago
3 viewers *
English term

Taking off

English to Arabic Other Engineering (general)
Part of the Second Party responsibilities is to prepare and provide As-Built Material Takeoff upon completing his scope of work. Accordingly the before said material quantity to the actual material withdrawn in which the first party will have the right to deduct the cost of material losses based on made comparisons of material if any after considering installation losses.

Discussion

ahmad4 (asker) Mar 9, 2016:
الحديث عن تركيب أنابيب صُلب
ahmad4 (asker) Mar 9, 2016:
Takeoff

Proposed translations

+1
36 mins
Selected

الدراسة التحليلية للمواد المصنعة اللازمة لإتمام التصميم.

Material Take Off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. We then use the material takeoff to create a bill of materials (BOM). Inspection does not aid in creating a bill of materials. Procurement and requisition are activities that occur after the bill of materials is complete
Peer comment(s):

agree Liliane Hatem
22 mins
Thanks Liliane.
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "شكرًأ جزيلأ"
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search